Home / Lead generation / New Construction
Lead generation for home builders and new-construction subs

New Construction Lead Generation from Building Permits

New Construction permit leads, new-construction advertising targets and follow-on work, from the public permits home builders and new-construction subs pull in your ZIPs.

Get 10 free jobs from my ZIPsEmail hello@curbsidesignal.comSee pricing

Quick answer. Permit-based lead generation for home builders and new-construction subs starts from jobs that are already happening: public building permits. Curbside Signal has 7,588 residential new-construction permits in the 8 weeks from Aug 31, 2026 to Oct 25, 2026 across the 25 metros where the new-construction feed is on sale, and 59 new-construction city pages. Plans start at $20/mo.

New Construction permit leads

Each record is a real permit from a city or county: issue date, permit type, address and ZIP, scope, declared value where published and the contractor of record where published. We map each permit to the new-construction trade and filter it to your ZIPs.

  • Subs: find the builders pulling the most new-home permits in your ZIPs.
  • Post-construction trades: landscaping, fencing, security and pest control.
  • Watch declared values by ZIP.

New Construction advertising with permit data

  • Spend where the work is: aim local ads and mailers at the ZIP codes with the most new-construction permits.
  • Market to the neighbors of active jobs: same-age houses on the same street often need the same work.
  • Follow-on demand. A new home leads to landscaping, fencing, security, pest control and window coverings.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Contractor activity: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

How to start

  1. Send your trade and ZIP codes. Email hello@curbsidesignal.com with your trade and ZIPs. We reply with a free 10-permit sample of new-construction permits and the trailing 8-week average count for those ZIPs.
  2. Pick a package. Starter is $20/mo for one trade and up to 5 ZIPs. Whole City is $140/mo for a whole metro and up to 5 trades.
  3. Work the Monday file. After checkout you get your first file within 24 hours of purchase, then a CSV and email digest every Monday. Use it for neighbor mailers, door-hangers, follow-on offers and ad targeting.

Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, you get 50% off next month. If a weekly file is ever late or missing, you get 50% off next month. Every package includes your first file within 24 hours of purchase. If we cannot deliver your first file within 24 hours of purchase, you get 50% off next month.

Questions

How does permit-based lead generation for home builders and new-construction subs work?

Cities and counties publish building permits. We pull them, keep residential new-construction permits, and send you the ones in your ZIPs every Monday as a CSV with the address, scope and value. You use them for neighbor marketing, follow-on offers and ad targeting.

How much do new-construction permit leads cost?

Starter is $20/mo for one trade and up to 5 ZIPs. Whole City is $140/mo for a whole metro and up to 5 trades. Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, you get 50% off next month. If a weekly file is ever late or missing, you get 50% off next month.

Can I use permit data for new-construction advertising?

Yes. Point mailers, door-hangers and local ads at the ZIP codes where new-construction permits are being pulled, and at the streets around active jobs. The permit file tells you where; it does not include homeowner phone numbers or emails.

Does a permit mean the job is still open?

Usually not: a permit typically means the job is sold. The value is neighbor marketing around active jobs, cross-trade follow-on work, and contractor activity where the jurisdiction publishes it.

See your jobs before you pay.

Send your trade, your ZIP codes and your email. We'll reply with 10 real jobs from your streets, or tell you plainly that we don't cover you yet.

Get 10 free jobs from my ZIPsEmail hello@curbsidesignal.comSee plans from $20/mo