Home / HVAC
For HVAC contractors

Remodels, additions and heat-pump swaps in your ZIPs.

Mechanical, furnace, AC and heat-pump permits plus the remodels and additions that usually need new or resized HVAC.

Signals we watch

What feeds a hvac list

  • Mechanical / HVAC change-out permits (furnace, AC, heat pump, mini-split)
  • Additions, ADUs and major remodels
  • Electrical service upgrades that often precede heat-pump installs
  • New-construction permits
How HVAC contractors use it

Ways to work the list

  • Remodel follow-on: added square footage means a load calc and often a new system.
  • Neighbor marketing around change-outs on same-age housing stock.
  • Competitor intel on who is pulling mechanical permits where the jurisdiction publishes it.
Cross-trade follow-on

Permits in other trades that point to yours

Remodels and additions drive HVAC, electrical, landscaping and pool work. An HVAC change-out often needs electrical capacity too.

Upstream: permits that create hvac demand

Downstream: trades that want your permits

HVAC leads in your ZIPs

Tell us your ZIP codes and we'll send a free hvac sample with the trailing 8-week permit count before you pay.

Request a hvac sample

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

HVAC questions

Do all cities publish mechanical permits separately?

No. Some publish building, electrical, plumbing and mechanical permits as separate datasets; others fold them into one building-permit file. We map each jurisdiction's permit types to trades and tell you which ones a feed covers before you buy.

Does a permit mean the job is still open?

Usually not: a permit typically means the job is sold. The value is neighbor marketing around active jobs, cross-trade follow-on work, and competitor intelligence.

How do I know you cover my ZIPs?

Ask for a free sample with your trade and ZIPs before you buy. We only sell jurisdictions we actually pull, and we show you the trailing 8-week average count first.

See your ZIPs before you pay.

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing