Home / Sewer & Septic / Virginia Beach, VA
Public permit data · updated Oct 18, 2026

Residential sewer and septic permits in Virginia Beach, VA

44 residential sewer and septic permits were issued in Virginia Beach, VA in the 8 weeks to Oct 9, 2026. Get them weekly by ZIP from Curbside Signal.

Source: Virginia Beach. Oct 9, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 9, 2026, 44 residential sewer and septic permits were issued in Virginia Beach, VA, according to public records from Virginia Beach. The busiest ZIP codes were 23455 (11 residential permits), 23452 (10 residential permits), 23451 (8 residential permits). The latest permit date published is Oct 9, 2026.

44
Residential sewer and septic permits, the 8 weeks ending Oct 9, 2026
8
ZIP codes with at least one permit
Oct 9, 2026
Latest permit date published
5.5
Permits per collected week on average
27
Days with at least one permit issued

Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, the next month is free. If a weekly file is ever late or missing, that month is free.

Every package includes your first file within 24 hours of purchase. If we can't deliver your first file within 24 hours of purchase, we refund you in full.

What a sewer and septic permit means in Virginia Beach

A residential sewer or septic permit covers lateral repairs, replacements, connections and septic systems. For a sewer contractor it marks blocks where old pipe is failing.

In Virginia Beach, permits were issued on 27 different days in the window; the most recent were Oct 9, 2026, Oct 7, 2026, Oct 5, 2026. The busiest ZIPs were 23455 (11), 23452 (10), 23451 (8).

By residential sewer and septic permit count, Virginia Beach ranks #15 of the 32 sewer and septic pages on this site and #1 of 2 in VA.

  • Mail the block around each lateral job.
  • Offer camera inspections to same-age houses nearby.
  • Track which ZIPs replace the most laterals.

See plans for Virginia Beach sewer and septic leads

Other work on the same permits

Share of these 44 residential permits whose type or description also matches another trade. These are the follow-on and partner trades on Virginia Beach jobs.

  • Plumbing: 42 residential permits (95%)
  • General remodel: 3 residential permits (7%)
  • Water heater: 3 residential permits (7%)
  • New construction: 2 residential permits (5%)

Weekly trend

Permits per 7-day period, ending Oct 9, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 21Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9

Top permit types

Permit type / subtypePermitsShare
Plumbing4295%
Electrical12%
Building12%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
234551125%2.88
234521023%2.50
23451818%2.50
23464511%2.38
2345449%1.75

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Sewer connection / cap920%
Lateral repair / replace920%
Septic12%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-0923451PlumbingPlumbing + sewerNot statedN/A
2026-10-0123464PlumbingPlumbing + sewerLateral repair / replaceN/A
2026-09-2123455PlumbingPlumbing + sewer + gas lineNot statedN/A
2026-09-1423455PlumbingPlumbing + water heater + sewerNot statedN/A
2026-08-3123462PlumbingPlumbing + sewerNot statedN/A
2026-08-2423462PlumbingPlumbing + sewerLateral repair / replaceN/A

Source

  • Virginia Beach: Permit records on services2.arcgis.com, published by Virginia Beach. Source dataset. Collected window(s): Aug 15, 2026 – Oct 9, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Sewer & Septic = the permit's type or work description matches the Curbside Signal sewer and septic rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Virginia Beach-Chesapeake-Norfolk, VA-NC metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: Sewer work follows repipes, remodels and new construction, and leads to landscaping repair.

Questions

How many residential sewer and septic permits were issued in Virginia Beach, VA recently?

44 residential sewer and septic permits in the public records we pulled, the 8 weeks ending Oct 9, 2026. Source: Virginia Beach.

Which Virginia Beach ZIP codes have the most sewer and septic permits?

23455 (11 residential permits), 23452 (10 residential permits), 23451 (8 residential permits), by residential sewer and septic permit count the 8 weeks ending Oct 9, 2026. 8 ZIP codes had at least one permit.

What is the median declared value of a residential sewer and septic permit in Virginia Beach?

The source does not publish valuations for these permits.

How do I get the Virginia Beach sewer and septic permit list, and what does it cost?

Request a free 10-permit sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, delivered every Monday. Every package includes your first file within 24 hours of purchase. Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, the next month is free. If a weekly file is ever late or missing, that month is free.

Virginia Beach sewer and septic leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free 10-permit sampleEmail hello@curbsidesignal.comSee pricing