Home / EV Chargers / Sacramento, CA
Public permit data · updated Oct 18, 2026

Residential EV charger permits in Sacramento, CA

82 residential EV charger permits issued by Sacramento (city), the 8 weeks ending Sep 27, 2026. Sep 27, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Sep 27, 2026, 82 residential EV charger permits were issued in Sacramento, CA, according to public records from Sacramento (city). The busiest ZIP codes were 95835 (12 permits), 95831 (11 permits), 95834 (8 permits). The median declared value was $1,500 across 82 permits that list one. The latest permit date published is Sep 27, 2026.

82
residential EV charger permits, the 8 weeks ending Sep 27, 2026
$1,500
median declared value (82 with value)
19
ZIP codes with at least one permit
Sep 27, 2026
latest permit date published
10.2
permits per collected week on average
24
days with at least one permit issued
38
distinct contractors of record (81 permits name one)

What an EV charger permit means in Sacramento

A residential EV charger permit means a home is adding a Level 2 charger, often with a new circuit or panel upgrade. For an electrician or charger installer it shows which streets are going electric.

In Sacramento, permits were issued on 24 different days in the window; the most recent were Sep 25, 2026, Sep 24, 2026, Sep 23, 2026. The busiest ZIPs were 95835 (12), 95831 (11), 95834 (8).

By residential EV charger permit count, Sacramento ranks #4 of the 27 EV charger pages on this site and #2 of 7 in CA.

  • Mail neighbors of each charger install while the EV is in the driveway.
  • Offer panel and service upgrades on the streets with the most chargers.
  • Pass the address to solar installers: EV owners are strong solar prospects.

See plans for Sacramento EV charger leads

Other work on the same permits

Share of these 82 permits whose type or description also matches another trade. These are the follow-on and partner trades on Sacramento jobs.

  • general remodel: 81 permits (99%)
  • electrical: 57 permits (70%)
  • new construction: 1 permits (1%)

Weekly trend

Permits per 7-day period, ending Sep 27, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 9Aug 16Aug 23Aug 30Sep 6Sep 13Sep 20Sep 27

Top permit types

Permit type / subtypePermitsShare
Residential / Remodel82100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
958351215%1.50
958311113%1.38
95834810%1.00
9581979%0.88
9582267%0.75

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Level 2 charger8098%
new circuit5871%
panel / service upgrade2530%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-09-2595832Residential / Remodelelectrical + EV charger + remodelLevel 2 charger; panel / service upgrade; new circuit$1,375
2026-09-1795820Residential / Remodelelectrical + EV charger + remodelLevel 2 charger; new circuit$1,100
2026-09-1195819Residential / Remodelelectrical + EV charger + remodelLevel 2 charger; new circuit$2,981
2026-09-0395831Residential / Remodelelectrical + EV charger + remodelLevel 2 charger; panel / service upgrade; new circuit$1,650
2026-08-2595835Residential / RemodelEV charger + remodelLevel 2 charger$2,000
2026-08-2195835Residential / Remodelelectrical + EV charger + remodelLevel 2 charger; new circuit$630

Source

  • Sacramento (city): Permit records on services5.arcgis.com, published by Sacramento (city). Source dataset. Collected window(s): Aug 3, 2026 – Sep 27, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). EV Chargers = the permit's type or work description matches the Curbside Signal EV charger rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Sacramento-Roseville-Folsom, CA metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: EV chargers lead to panel and service upgrades, and often to solar and battery storage.

Questions

How many residential EV charger permits were issued in Sacramento, CA recently?

82 residential EV charger permits in the public records we pulled, the 8 weeks ending Sep 27, 2026. Source: Sacramento (city).

Which Sacramento ZIP codes have the most EV charger permits?

95835 (12 permits), 95831 (11 permits), 95834 (8 permits), by residential EV charger permit count the 8 weeks ending Sep 27, 2026. 19 ZIP codes had at least one permit.

What is the median declared value of a residential EV charger permit in Sacramento?

$1,500, across 82 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Sacramento EV charger permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Sacramento EV charger leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing