Residential ADU and addition permits in Sacramento, CA
48 residential ADU and addition permits issued by Sacramento (city), the 8 weeks ending Sep 27, 2026. Sep 27, 2026 is the latest issue date the source has published.
Quick answer. In the 8 weeks ending Sep 27, 2026, 48 residential ADU and addition permits were issued in Sacramento, CA, according to public records from Sacramento (city). The busiest ZIP codes were 95819 (7 permits), 95817 (5 permits), 95822 (5 permits). The median declared value was $48,000 across 48 permits that list one. The latest permit date published is Sep 27, 2026.
What an ADU and addition permit means in Sacramento
A residential ADU or addition permit is a new unit or more square footage on an existing home. For an ADU builder or addition contractor it shows where lots are being built out, and the subs those jobs need.
In Sacramento, permits were issued on 21 different days in the window; the most recent were Sep 25, 2026, Sep 24, 2026, Sep 23, 2026. The busiest ZIPs were 95819 (7), 95817 (5), 95822 (5).
By residential ADU and addition permit count, Sacramento ranks #18 of the 49 ADU and addition pages on this site and #5 of 11 in CA.
- Mail the neighbors of each ADU.
- Pitch trades to the builders pulling the most permits.
- Track declared values by ZIP.
Other work on the same permits
Share of these 48 permits whose type or description also matches another trade. These are the follow-on and partner trades on Sacramento jobs.
- deck/patio: 16 permits (33%)
- electrical: 13 permits (27%)
- garage: 10 permits (21%)
- windows & doors: 8 permits (17%)
Weekly trend
Permits per 7-day period, ending Sep 27, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.
Top permit types
| Permit type / subtype | Permits | Share |
|---|---|---|
| Residential / Addition | 31 | 65% |
| Residential / Remodel | 7 | 15% |
| Residential / Housing Dept Permit | 4 | 8% |
| Residential / Web-Minor | 3 | 6% |
| Residential / Demolition | 2 | 4% |
Busiest ZIP codes
| ZIP | Permits | Share | 8-wk avg / week |
|---|---|---|---|
| 95819 | 7 | 15% | 0.88 |
| 95817 | 5 | 10% | 0.62 |
| 95822 | 5 | 10% | 0.62 |
| 95835 | 5 | 10% | 0.62 |
| 95820 | 4 | 8% | 0.50 |
8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.
Type stated in the permit
| Type | Permits | Share |
|---|---|---|
| room addition | 34 | 71% |
| ADU | 12 | 25% |
| junior ADU | 3 | 6% |
| second story | 1 | 2% |
Parsed from the permit's own type and work text. A permit can state more than one; many state none.
Sample rows
Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.
| Issued | ZIP | Permit type | Scope | Type | Declared value |
|---|---|---|---|---|---|
| 2026-09-25 | 95816 | Residential / Demolition | HVAC + plumbing + windows/doors + addition/ADU + demolition + fence + sewer + garage | ADU | $2,000 |
| 2026-09-22 | 95817 | Residential / Demolition | addition/ADU + demolition | ADU | $9,000 |
| 2026-09-11 | 95831 | Residential / Addition | electrical + addition/ADU + deck/patio | room addition | $29,148 |
| 2026-09-10 | 95822 | Residential / Addition | addition/ADU + fire sprinkler + garage | room addition | $41,250 |
| 2026-09-02 | 95823 | Residential / Housing Dept Permit | roofing + HVAC + plumbing + water heater + electrical + windows/doors + kitchen/bath remod | room addition | $85,000 |
| 2026-08-24 | 95816 | Residential / Addition | solar + addition/ADU + deck/patio + garage + irrigation/landscape | room addition | $181,489 |
Source
- Sacramento (city): Permit records on services5.arcgis.com, published by Sacramento (city). Source dataset. Collected window(s): Aug 3, 2026 – Sep 27, 2026. Last pulled Oct 18, 2026.
Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). ADUs & Additions = the permit's type or work description matches the Curbside Signal ADU and addition rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Sacramento-Roseville-Folsom, CA metro: every trade × city page there.
The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:
- Neighbor marketing around active jobs: same-age houses on the same street.
- Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
- Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
- Early-stage projects for commercial trades and GC subs.
Follow-on: ADUs and additions drive HVAC, electrical, plumbing, solar and landscaping work.
Other trades in Sacramento, CA
Residential permits in the same window, by trade.
Questions
How many residential ADU and addition permits were issued in Sacramento, CA recently?
48 residential ADU and addition permits in the public records we pulled, the 8 weeks ending Sep 27, 2026. Source: Sacramento (city).
Which Sacramento ZIP codes have the most ADU and addition permits?
95819 (7 permits), 95817 (5 permits), 95822 (5 permits), by residential ADU and addition permit count the 8 weeks ending Sep 27, 2026. 14 ZIP codes had at least one permit.
What is the median declared value of a residential ADU and addition permit in Sacramento?
$48,000, across 48 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.
How do I get the Sacramento ADU and addition permit list, and what does it cost?
Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.
Sacramento ADU and addition leads, every Monday
Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.