Home / Demolition / Winter Park, FL
Public permit data · updated Oct 18, 2026

Residential demolition permits in Winter Park, FL

21 residential demolition permits issued by Winter Park, the 8 weeks ending Oct 18, 2026. Oct 18, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 18, 2026, 21 residential demolition permits were issued in Winter Park, FL, according to public records from Winter Park. The busiest ZIP codes were 32789 (17 permits), 32792 (4 permits). The median declared value was $14,500 across 21 permits that list one. The latest permit date published is Oct 18, 2026.

21
residential demolition permits, the 8 weeks ending Oct 18, 2026
$14,500
median declared value (21 with value)
2
ZIP codes with at least one permit
Oct 18, 2026
latest permit date published
2.6
permits per collected week on average
14
days with at least one permit issued
13
distinct contractors of record (21 permits name one)

What a demolition permit means in Winter Park

A residential demolition permit is a house or structure coming down, usually before a rebuild. For a demolition contractor or hauler it's a site that will need clearing; for builders, a lot being redeveloped.

In Winter Park, permits were issued on 14 different days in the window; the most recent were Oct 16, 2026, Oct 15, 2026, Oct 13, 2026. The busiest ZIPs were 32789 (17), 32792 (4).

By residential demolition permit count, Winter Park ranks #15 of the 31 demolition pages on this site and #2 of 3 in FL.

  • Haulers: reach the site before demo starts.
  • Builders: track lots being cleared.
  • Watch which ZIPs are redeveloping fastest.

See plans for Winter Park demolition leads

Other work on the same permits

Share of these 21 permits whose type or description also matches another trade. These are the follow-on and partner trades on Winter Park jobs.

  • pool & spa: 2 permits (10%)
  • new construction: 2 permits (10%)
  • irrigation/landscape: 1 permits (5%)

Weekly trend

Permits per 7-day period, ending Oct 18, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 30Sep 6Sep 13Sep 20Sep 27Oct 4Oct 11Oct 18

Top permit types

Permit type / subtypePermitsShare
Demolition / Dwelling21100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
327891781%2.38
32792419%0.50

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
whole structure21100%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1632789Demolition / Dwellingdemolitionwhole structure$10,000
2026-10-1332789Demolition / Dwellingdemolitionwhole structure$17,000
2026-09-2332789Demolition / Dwellingdemolitionwhole structure$2,000
2026-09-1632789Demolition / Dwellingnew construction + demolitionwhole structure$13,000
2026-09-1132789Demolition / Dwellingdemolitionwhole structure$13,000
2026-09-0932789Demolition / Dwellingdemolitionwhole structure$14,000

Source

  • Winter Park: Permit records on gis.cityofwinterpark.org, published by Winter Park. Source dataset. Collected window(s): Aug 24, 2026 – Oct 18, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Demolition = the permit's type or work description matches the Curbside Signal demolition rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Orlando-Kissimmee-Sanford, FL metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: Demolition leads to new construction, foundation and utility work.

Questions

How many residential demolition permits were issued in Winter Park, FL recently?

21 residential demolition permits in the public records we pulled, the 8 weeks ending Oct 18, 2026. Source: Winter Park.

Which Winter Park ZIP codes have the most demolition permits?

32789 (17 permits), 32792 (4 permits), by residential demolition permit count the 8 weeks ending Oct 18, 2026. 2 ZIP codes had at least one permit.

What is the median declared value of a residential demolition permit in Winter Park?

$14,500, across 21 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Winter Park demolition permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Winter Park demolition leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing