Residential windows & doors permits in Plano, TX
26 residential windows & doors permits issued by Collin County TX (appraisal district permits), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.
Quick answer. In the 8 weeks ending Oct 15, 2026, 26 residential windows & doors permits were issued in Plano, TX, according to public records from Collin County TX (appraisal district permits). The busiest ZIP codes were 75023 (7 permits), 75093 (7 permits), 75025 (6 permits). The latest permit date published is Oct 15, 2026.
What a windows & doors permit means in Plano
A residential windows and doors permit is a window replacement, new exterior or patio door, or skylight. For a window and door company it marks houses replacing original units, usually in neighborhoods built in the same era with the same windows.
In Plano, permits were issued on 6 different days in the window; the most recent were Aug 31, 2026, Aug 28, 2026, Aug 27, 2026. The busiest ZIPs were 75023 (7), 75093 (7), 75025 (6).
By residential windows & doors permit count, Plano ranks #41 of the 54 windows & doors pages on this site and #2 of 2 in TX.
- Mail and canvass the same-age houses around each replacement.
- See which ZIPs replace the most windows and where patio and sliding doors cluster.
- Siding, insulation and remodel permits nearby point to homeowners already upgrading the envelope.
Other work on the same permits
None of these permits match another trade in our rules.
Weekly trend
Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.
Top permit types
| Permit type / subtype | Permits | Share |
|---|---|---|
| Miscellaneous / Residential | 26 | 100% |
Busiest ZIP codes
| ZIP | Permits | Share | 8-wk avg / week |
|---|---|---|---|
| 75023 | 7 | 27% | 0.88 |
| 75093 | 7 | 27% | 0.88 |
| 75025 | 6 | 23% | 0.75 |
| 75024 | 5 | 19% | 0.62 |
| 75075 | 1 | 4% | 0.12 |
8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.
Item stated in the permit
| Item | Permits | Share |
|---|---|---|
| entry / exterior door | 6 | 23% |
| windows (11) | 4 | 15% |
| windows | 3 | 12% |
| windows (12) | 2 | 8% |
| windows (15) | 2 | 8% |
Parsed from the permit's own type and work text. A permit can state more than one; many state none.
Sample rows
Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.
| Issued | ZIP | Permit type | Scope | Item | Declared value |
|---|---|---|---|---|---|
| 2026-08-31 | 75075 | Miscellaneous / Residential | windows/doors | windows (12) | n/a |
| 2026-08-31 | 75093 | Miscellaneous / Residential | windows/doors | windows | n/a |
| 2026-08-28 | 75023 | Miscellaneous / Residential | windows/doors | windows (23) | n/a |
| 2026-08-27 | 75093 | Miscellaneous / Residential | windows/doors | entry / exterior door | n/a |
| 2026-08-26 | 75025 | Miscellaneous / Residential | windows/doors | windows (21) | n/a |
| 2026-08-25 | 75025 | Miscellaneous / Residential | windows/doors | windows (24) | n/a |
Source
- Collin County TX (appraisal district permits): Permit records on data.texas.gov (dataset 82ee-gbj5), published by Collin County TX (appraisal district permits). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.
Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Windows & Doors = the permit's type or work description matches the Curbside Signal windows & doors rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Dallas-Fort Worth-Arlington, TX metro: every trade × city page there.
The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:
- Neighbor marketing around active jobs: same-age houses on the same street.
- Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
- Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
- Early-stage projects for commercial trades and GC subs.
Follow-on: Remodels, additions and siding jobs are the biggest upstream drivers of window and door work.
Questions
How many residential windows & doors permits were issued in Plano, TX recently?
26 residential windows & doors permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Collin County TX (appraisal district permits).
Which Plano ZIP codes have the most windows & doors permits?
75023 (7 permits), 75093 (7 permits), 75025 (6 permits), by residential windows & doors permit count the 8 weeks ending Oct 15, 2026. 5 ZIP codes had at least one permit.
What is the median declared value of a residential windows & doors permit in Plano?
The source does not publish valuations for these permits.
How do I get the Plano windows & doors permit list, and what does it cost?
Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.
Plano windows & doors leads, every Monday
Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.