Home / Remodeling & GC / Murphy, TX
Public permit data · updated Oct 18, 2026

Residential remodel permits in Murphy, TX

16 residential remodel permits issued by Collin County TX (appraisal district permits), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 15, 2026, 16 residential remodel permits were issued in Murphy, TX, according to public records from Collin County TX (appraisal district permits). The busiest ZIP codes were 75094 (16 permits). The median declared value was $10,778 across 16 permits that list one. The latest permit date published is Oct 15, 2026.

16
residential remodel permits, the 8 weeks ending Oct 15, 2026
$10,778
median declared value (16 with value)
1
ZIP codes with at least one permit
Oct 15, 2026
latest permit date published
2.0
permits per collected week on average
11
days with at least one permit issued
13
distinct contractors of record (16 permits name one)

What a remodel permit means in Murphy

A residential remodel permit is a general alteration or renovation that doesn't fit a single trade. For a remodeler or GC it shows who is renovating where, the declared job value, and the subs those jobs will need.

In Murphy, permits were issued on 11 different days in the window; the most recent were Oct 15, 2026, Sep 22, 2026, Sep 18, 2026. The busiest ZIPs were 75094 (16).

By residential remodel permit count, Murphy ranks #100 of the 111 remodel pages on this site and #9 of 10 in TX.

  • Subs: find the remodelers pulling the most permits in your ZIPs and pitch them.
  • Mail neighbors of active renovations: same-age houses tend to need the same updates.
  • Watch declared values by ZIP to see where larger renovations cluster.

See plans for Murphy remodel leads

Other work on the same permits

Share of these 16 permits whose type or description also matches another trade. These are the follow-on and partner trades on Murphy jobs.

  • foundation: 11 permits (69%)
  • deck/patio: 1 permits (6%)

Weekly trend

Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 27Sep 3Sep 10Sep 17Sep 24Oct 1Oct 8Oct 15

Top permit types

Permit type / subtypePermitsShare
Miscellaneous / Residential1062%
Remodeling of Existing Structure / Residential531%
Roof/Re-Roof / Residential16%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
7509416100%2.00

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
alteration / repair1169%
interior remodel531%
structural531%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1575094Roof/Re-Roof / Residentialremodel + foundationalteration / repair$11,257
2026-09-2275094Miscellaneous / Residentialremodel + foundationalteration / repair$6,320
2026-09-1875094Remodeling of Existing Structure / Residentialremodelinterior remodel; structural$88,000
2026-09-1775094Miscellaneous / Residentialremodel + foundationalteration / repair$16,672
2026-09-0275094Miscellaneous / Residentialremodel + foundationalteration / repair$3,985
2026-09-0175094Miscellaneous / Residentialremodel + foundationalteration / repair$7,165

Source

  • Collin County TX (appraisal district permits): Permit records on data.texas.gov (dataset 82ee-gbj5), published by Collin County TX (appraisal district permits). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Remodeling & GC = the permit's type or work description matches the Curbside Signal remodel rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Dallas-Fort Worth-Arlington, TX metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A remodel drives HVAC, electrical, plumbing, landscaping and pool work. A new build adds pest control, security and landscaping.

Other trades in Murphy, TX

Residential permits in the same window, by trade.

Questions

How many residential remodel permits were issued in Murphy, TX recently?

16 residential remodel permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Collin County TX (appraisal district permits).

Which Murphy ZIP codes have the most remodel permits?

75094 (16 permits), by residential remodel permit count the 8 weeks ending Oct 15, 2026. 1 ZIP codes had at least one permit.

What is the median declared value of a residential remodel permit in Murphy?

$10,778, across 16 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Murphy remodel permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Murphy remodel leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing