Home / Pool & Spa / Cary, NC
Public permit data · updated Oct 18, 2026

Residential pool & spa permits in Cary, NC

16 residential pool & spa permits issued by Cary NC (building permit applications), the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 16 residential pool & spa permits were issued in Cary, NC, according to public records from Cary NC (building permit applications). The busiest ZIP codes were 27519 (6 permits), 27511 (4 permits), 27606 (2 permits). The latest permit date published is Oct 16, 2026.

16
residential pool & spa permits, the 8 weeks ending Oct 16, 2026
n/a
median declared value
7
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
2.0
permits per collected week on average
10
days with at least one permit issued
11
distinct contractors of record (16 permits name one)

What a pool & spa permit means in Cary

A residential pool or spa permit is a new pool, spa, remodel or equipment job. For a pool builder the job is sold, but a backyard project is visible to every neighbor, and new pools need service, fencing, landscaping and electrical work afterward.

In Cary, permits were issued on 10 different days in the window; the most recent were Oct 16, 2026, Oct 13, 2026, Oct 1, 2026. The busiest ZIPs were 27519 (6), 27511 (4), 27606 (2).

By residential pool & spa permit count, Cary ranks #23 of the 31 pool & spa pages on this site and #2 of 2 in NC.

  • Mail neighbors of new pool starts while construction is visible.
  • Offer weekly service and equipment upgrades to new-pool addresses once the job closes.
  • Pass new-pool addresses to landscapers, fence and electrical partners.

See plans for Cary pool & spa leads

Other work on the same permits

Share of these 16 permits whose type or description also matches another trade. These are the follow-on and partner trades on Cary jobs.

  • fencing: 1 permits (6%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
Single Family Residential Add/ / Existing16100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
27519638%0.75
27511425%0.50
27606212%0.25
2753916%0.12
2751816%0.12

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
in-ground pool1169%
spa / hot tub425%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1627519Single Family Residential Add/ / Existingpool/spain-ground pooln/a
2026-10-1327513Single Family Residential Add/ / Existingpool/spain-ground pooln/a
2026-10-0127523Single Family Residential Add/ / Existingpool/spain-ground pooln/a
2026-09-3027519Single Family Residential Add/ / Existingpool/spain-ground pooln/a
2026-09-2127606Single Family Residential Add/ / Existingpool/spanot statedn/a
2026-09-1527511Single Family Residential Add/ / Existingpool/spain-ground pool; spa / hot tubn/a

Source

  • Cary NC (building permit applications): Permit records on data.townofcary.org (dataset permit-applications), published by Cary NC (building permit applications). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Pool & Spa = the permit's type or work description matches the Curbside Signal pool & spa rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Raleigh-Cary, NC metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A new pool drives landscaping, fencing, electrical and pool-service demand at the same address.

Questions

How many residential pool & spa permits were issued in Cary, NC recently?

16 residential pool & spa permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: Cary NC (building permit applications).

Which Cary ZIP codes have the most pool & spa permits?

27519 (6 permits), 27511 (4 permits), 27606 (2 permits), by residential pool & spa permit count the 8 weeks ending Oct 16, 2026. 7 ZIP codes had at least one permit.

What is the median declared value of a residential pool & spa permit in Cary?

The source does not publish valuations for these permits.

How do I get the Cary pool & spa permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Cary pool & spa leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing