Home / New Construction / Washington, DC
Public permit data · updated Oct 18, 2026

Residential new-construction permits in Washington, DC

82 residential new-construction permits issued by Washington DC (building permits 2026), the 8 weeks ending Oct 14, 2026. Oct 14, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 14, 2026, 82 residential new-construction permits were issued in Washington, DC, according to public records from Washington DC (building permits 2026). The busiest ZIP codes were 20003 (39 permits), 20018 (10 permits), 20012 (7 permits). The latest permit date published is Oct 14, 2026.

82
residential new-construction permits, the 8 weeks ending Oct 14, 2026
n/a
median declared value
14
ZIP codes with at least one permit
Oct 14, 2026
latest permit date published
10.2
permits per collected week on average
21
days with at least one permit issued

What a new-construction permit means in Washington

A residential new-construction permit is a new home or a trade permit on one. For a builder's sub it shows who is building where; for post-construction trades it's a house that will need finishing.

In Washington, permits were issued on 21 different days in the window; the most recent were Oct 14, 2026, Oct 13, 2026, Oct 9, 2026. The busiest ZIPs were 20003 (39), 20018 (10), 20012 (7).

By residential new-construction permit count, Washington ranks #33 of the 83 new-construction pages on this site.

  • Subs: pitch the most active builders.
  • Post-construction trades: plan around completion dates.
  • Track declared values by ZIP.

See plans for Washington new-construction leads

Other work on the same permits

Share of these 82 permits whose type or description also matches another trade. These are the follow-on and partner trades on Washington jobs.

  • electrical: 8 permits (10%)
  • plumbing: 7 permits (9%)
  • irrigation/landscape: 5 permits (6%)
  • fencing: 3 permits (4%)

Weekly trend

Permits per 7-day period, ending Oct 14, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 26Sep 2Sep 9Sep 16Sep 23Sep 30Oct 7Oct 14

Top permit types

Permit type / subtypePermitsShare
CONSTRUCTION / NEW BUILDING5263%
SHOP DRAWING / ELEVATOR - NEW1316%
CONSTRUCTION / ADDITION ALTERATION REPAIR810%
CONSTRUCTION / ALTERATION AND REPAIR56%
CONSTRUCTION / SWIMMING POOL11%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
200033948%5.25
200181012%1.25
2001279%0.88
2001667%1.00
2000767%1.38

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
duplex / townhome4859%
single-family2328%
trade permit on a new home1012%
multifamily11%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1420007CONSTRUCTION / NEW BUILDINGplumbing + electrical + new construction + irrigation/landscapesingle-family; trade permit on a new homen/a
2026-10-0720012CONSTRUCTION / NEW BUILDINGnew constructionduplex / townhomen/a
2026-10-0520003SHOP DRAWING / ELEVATOR - NEWnew constructionnot statedn/a
2026-09-1520018CONSTRUCTION / NEW BUILDINGnew constructionduplex / townhomen/a
2026-09-0120003CONSTRUCTION / NEW BUILDINGnew constructionduplex / townhomen/a
2026-09-0120003CONSTRUCTION / NEW BUILDINGnew constructionduplex / townhomen/a

Source

  • Washington DC (building permits 2026): Permit records on maps2.dcgis.dc.gov, published by Washington DC (building permits 2026). Source dataset. Collected window(s): Aug 20, 2026 – Oct 14, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). New Construction = the permit's type or work description matches the Curbside Signal new-construction rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Washington-Arlington-Alexandria, DC-VA-MD-WV metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A new home leads to landscaping, fencing, security, pest control and window coverings.

Questions

How many residential new-construction permits were issued in Washington, DC recently?

82 residential new-construction permits in the public records we pulled, the 8 weeks ending Oct 14, 2026. Source: Washington DC (building permits 2026).

Which Washington ZIP codes have the most new-construction permits?

20003 (39 permits), 20018 (10 permits), 20012 (7 permits), by residential new-construction permit count the 8 weeks ending Oct 14, 2026. 14 ZIP codes had at least one permit.

What is the median declared value of a residential new-construction permit in Washington?

The source does not publish valuations for these permits.

How do I get the Washington new-construction permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Washington new-construction leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing