Residential new-construction permits in Rancho Santa Fe, CA
10 residential new-construction permits issued by San Diego County unincorporated, the 8 weeks ending Oct 17, 2026. Oct 17, 2026 is the latest issue date the source has published.
Quick answer. In the 8 weeks ending Oct 17, 2026, 10 residential new-construction permits were issued in Rancho Santa Fe, CA, according to public records from San Diego County unincorporated. The busiest ZIP codes were 92067 (10 permits). The median declared value was $73,112 across 10 permits that list one. The latest permit date published is Oct 17, 2026.
What a new-construction permit means in Rancho Santa Fe
A residential new-construction permit is a new home or a trade permit on one. For a builder's sub it shows who is building where; for post-construction trades it's a house that will need finishing.
In Rancho Santa Fe, permits were issued on 9 different days in the window; the most recent were Oct 8, 2026, Oct 6, 2026, Sep 29, 2026. The busiest ZIPs were 92067 (10).
By residential new-construction permit count, Rancho Santa Fe ranks #82 of the 83 new-construction pages on this site and #18 of 19 in CA.
- Subs: pitch the most active builders.
- Post-construction trades: plan around completion dates.
- Track declared values by ZIP.
Other work on the same permits
Share of these 10 permits whose type or description also matches another trade. These are the follow-on and partner trades on Rancho Santa Fe jobs.
- pool & spa: 6 permits (60%)
- electrical: 3 permits (30%)
- irrigation/landscape: 2 permits (20%)
- fencing: 2 permits (20%)
Weekly trend
Permits per 7-day period, ending Oct 17, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.
Top permit types
| Permit type / subtype | Permits | Share |
|---|---|---|
| Building / New Residential Acc Structure | 8 | 80% |
| Building / PDS Residential Minor Grading | 1 | 10% |
| Building / New Primary Residential SFD-MH | 1 | 10% |
Busiest ZIP codes
| ZIP | Permits | Share | 8-wk avg / week |
|---|---|---|---|
| 92067 | 10 | 100% | 1.25 |
8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.
Type stated in the permit
| Type | Permits | Share |
|---|---|---|
| single-family | 10 | 100% |
| duplex / townhome | 6 | 60% |
| trade permit on a new home | 2 | 20% |
Parsed from the permit's own type and work text. A permit can state more than one; many state none.
Sample rows
Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.
| Issued | ZIP | Permit type | Scope | Type | Declared value |
|---|---|---|---|---|---|
| 2026-10-08 | 92067 | Building / New Residential Acc Structure | pool/spa + new construction | single-family; duplex / townhome | $71,148 |
| 2026-10-06 | 92067 | Building / New Residential Acc Structure | new construction | single-family; duplex / townhome | $8,855 |
| 2026-09-29 | 92067 | Building / New Residential Acc Structure | plumbing + electrical + pool/spa + new construction | single-family; duplex / townhome; trade permit on a new home | $44,968 |
| 2026-09-23 | 92067 | Building / New Residential Acc Structure | pool/spa + new construction | single-family; duplex / townhome | $8,085 |
| 2026-09-15 | 92067 | Building / New Residential Acc Structure | pool/spa + new construction | single-family; duplex / townhome | $75,075 |
| 2026-09-08 | 92067 | Building / New Residential Acc Structure | pool/spa + new construction | single-family | $91,290 |
Source
- San Diego County unincorporated: Permit records on internal-sandiegocounty.data.socrata.com (dataset red2-qccu), published by San Diego County unincorporated. Source dataset. Collected window(s): Aug 23, 2026 – Oct 17, 2026. Last pulled Oct 18, 2026.
Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). New Construction = the permit's type or work description matches the Curbside Signal new-construction rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the San Diego-Chula Vista-Carlsbad, CA metro: every trade × city page there.
The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:
- Neighbor marketing around active jobs: same-age houses on the same street.
- Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
- Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
- Early-stage projects for commercial trades and GC subs.
Follow-on: A new home leads to landscaping, fencing, security, pest control and window coverings.
Other trades in Rancho Santa Fe, CA
Residential permits in the same window, by trade.
Questions
How many residential new-construction permits were issued in Rancho Santa Fe, CA recently?
10 residential new-construction permits in the public records we pulled, the 8 weeks ending Oct 17, 2026. Source: San Diego County unincorporated.
Which Rancho Santa Fe ZIP codes have the most new-construction permits?
92067 (10 permits), by residential new-construction permit count the 8 weeks ending Oct 17, 2026. 1 ZIP codes had at least one permit.
What is the median declared value of a residential new-construction permit in Rancho Santa Fe?
$73,112, across 10 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.
How do I get the Rancho Santa Fe new-construction permit list, and what does it cost?
Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.
Rancho Santa Fe new-construction leads, every Monday
Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.