Home / New Construction / Montgomery County, MD
Public permit data · updated Oct 18, 2026

Residential new-construction permits in Montgomery County, MD

137 residential new-construction permits were issued in Montgomery County, MD in the 8 weeks to Oct 16, 2026. Get them weekly by ZIP from Curbside Signal.

Source: Montgomery County MD (residential), Montgomery County MD (electrical), Montgomery County MD (mechanical). Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 137 residential new-construction permits were issued in Montgomery County, MD, according to public records from Montgomery County MD (residential), Montgomery County MD (electrical), Montgomery County MD (mechanical). The busiest ZIP codes were 20817 (26 residential permits), 20895 (22 residential permits), 20841 (13 residential permits). The median declared value was $412,500 across 60 residential permits that list one. The latest permit date published is Oct 16, 2026.

137
Residential new-construction permits, the 8 weeks ending Oct 16, 2026
$412,500
Median declared value (60 with value)
22
ZIP codes with at least one permit
Oct 16, 2026
Latest permit date published
17.1
Permits per collected week on average
37
Days with at least one permit issued

Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, the next month is free. If a weekly file is ever late or missing, that month is free.

Every package includes your first file within 24 hours of purchase. If we can't deliver your first file within 24 hours of purchase, we refund you in full.

What a new-construction permit means in Montgomery County

A residential new-construction permit is a new home or a trade permit on one. For a builder's sub it shows who is building where; for post-construction trades it's a house that will need finishing.

In Montgomery County, permits were issued on 37 different days in the window; the most recent were Oct 15, 2026, Oct 14, 2026, Oct 12, 2026. The busiest ZIPs were 20817 (26), 20895 (22), 20841 (13).

By residential new-construction permit count, Montgomery County ranks #26 of the 91 new-construction pages on this site and #2 of 7 in MD.

  • Subs: pitch the most active builders.
  • Post-construction trades: plan around completion dates.
  • Track declared values by ZIP.

See plans for Montgomery County new-construction leads

Other work on the same permits

Share of these 137 residential permits whose type or description also matches another trade. These are the follow-on and partner trades on Montgomery County jobs.

  • Electrical: 59 residential permits (43%)
  • HVAC: 23 residential permits (17%)
  • Demolition: 7 residential permits (5%)
  • Plumbing: 2 residential permits (1%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
BUILDING RESIDENTIAL PERMIT / CONSTRUCT SINGLE FAMILY DWELLING3626%
ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING3526%
MECHANICAL PERMIT / INSTALL SINGLE FAMILY DWELLING2115%
ELECTRICAL PERMIT / INSTALL TOWNHOUSE1914%
BUILDING RESIDENTIAL PERMIT / ADD SINGLE FAMILY DWELLING97%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
208172619%3.25
208952216%2.88
20841139%2.25
20814118%1.38
2081586%1.00

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count. 3 permits on this page have no ZIP in the source.

Type stated in the permit

TypePermitsShare
Single-family10879%
Trade permit on a new home8159%
Duplex / townhome2720%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1520850BUILDING RESIDENTIAL PERMIT / CONSTRUCT SINGLE FAMILY DWELLINGNew construction + sewerSingle-family$1,000,000
2026-10-0820895MECHANICAL PERMIT / REPLACE SINGLE FAMILY DWELLINGHVAC + new constructionSingle-family; trade permit on a new homeN/A
2026-09-2920817ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGElectrical + new constructionSingle-family; trade permit on a new homeN/A
2026-09-2320814BUILDING RESIDENTIAL PERMIT / CONSTRUCT SINGLE FAMILY DWELLINGNew constructionSingle-family$800,000
2026-09-1520841BUILDING RESIDENTIAL PERMIT / CONSTRUCT DUPLEXNew constructionDuplex / townhome$174,007
2026-09-0320815BUILDING RESIDENTIAL PERMIT / ADD SINGLE FAMILY DWELLINGNew constructionSingle-family$400,000

Source

  • Montgomery County MD (electrical): Permit records on data.montgomerycountymd.gov (dataset qxie-8qnp), published by Montgomery County MD (electrical). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.
  • Montgomery County MD (mechanical): Permit records on data.montgomerycountymd.gov (dataset ih88-a6aa), published by Montgomery County MD (mechanical). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.
  • Montgomery County MD (residential): Permit records on data.montgomerycountymd.gov (dataset m88u-pqki), published by Montgomery County MD (residential). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). New Construction = the permit's type or work description matches the Curbside Signal new-construction rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Washington-Arlington-Alexandria, DC-VA-MD-WV metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A new home leads to landscaping, fencing, security, pest control and window coverings.

Questions

How many residential new-construction permits were issued in Montgomery County, MD recently?

137 residential new-construction permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: Montgomery County MD (residential), Montgomery County MD (electrical), Montgomery County MD (mechanical).

Which Montgomery County ZIP codes have the most new-construction permits?

20817 (26 residential permits), 20895 (22 residential permits), 20841 (13 residential permits), by residential new-construction permit count the 8 weeks ending Oct 16, 2026. 22 ZIP codes had at least one permit.

What is the median declared value of a residential new-construction permit in Montgomery County?

$412,500, across 60 residential permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Montgomery County new-construction permit list, and what does it cost?

Request a free 10-permit sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, delivered every Monday. Every package includes your first file within 24 hours of purchase. Guarantee on every package: If a month comes in under half the 8-week average permit count for your ZIPs and trades, the next month is free. If a weekly file is ever late or missing, that month is free.

Montgomery County new-construction leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free 10-permit sampleEmail hello@curbsidesignal.comSee pricing