Home / New Construction / McKinney, TX
Public permit data · updated Oct 18, 2026

Residential new-construction permits in McKinney, TX

107 residential new-construction permits issued by Collin County TX (appraisal district permits), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 15, 2026, 107 residential new-construction permits were issued in McKinney, TX, according to public records from Collin County TX (appraisal district permits). The busiest ZIP codes were 75071 (99 permits), 75069 (5 permits), 75072 (3 permits). The median declared value was $361,248 across 17 permits that list one. The latest permit date published is Oct 15, 2026.

107
residential new-construction permits, the 8 weeks ending Oct 15, 2026
$361,248
median declared value (17 with value)
3
ZIP codes with at least one permit
Oct 15, 2026
latest permit date published
13.4
permits per collected week on average
22
days with at least one permit issued
75
distinct contractors of record (107 permits name one)

What a new-construction permit means in McKinney

A residential new-construction permit is a new home or a trade permit on one. For a builder's sub it shows who is building where; for post-construction trades it's a house that will need finishing.

In McKinney, permits were issued on 22 different days in the window; the most recent were Oct 9, 2026, Oct 2, 2026, Sep 28, 2026. The busiest ZIPs were 75071 (99), 75069 (5), 75072 (3).

By residential new-construction permit count, McKinney ranks #33 of the 89 new-construction pages on this site and #5 of 14 in TX.

  • Subs: pitch the most active builders.
  • Post-construction trades: plan around completion dates.
  • Track declared values by ZIP.

See plans for McKinney new-construction leads

Other work on the same permits

None of these permits match another trade in our rules.

Weekly trend

Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 27Sep 3Sep 10Sep 17Sep 24Oct 1Oct 8Oct 15

Top permit types

Permit type / subtypePermitsShare
New Construction / Residential107100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
750719993%12.62
7506955%1.25
7507233%0.38

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
duplex / townhome44%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-0975071New Construction / Residentialnew constructionnot statedn/a
2026-09-2675071New Construction / Residentialnew constructionnot statedn/a
2026-09-1775071New Construction / Residentialnew constructionnot statedn/a
2026-09-1575071New Construction / Residentialnew constructionnot statedn/a
2026-09-0475071New Construction / Residentialnew constructionnot statedn/a
2026-08-2875071New Construction / Residentialnew constructionnot statedn/a

Source

  • Collin County TX (appraisal district permits): Permit records on data.texas.gov (dataset 82ee-gbj5), published by Collin County TX (appraisal district permits). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). New Construction = the permit's type or work description matches the Curbside Signal new-construction rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Dallas-Fort Worth-Arlington, TX metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A new home leads to landscaping, fencing, security, pest control and window coverings.

Other trades in McKinney, TX

Residential permits in the same window, by trade.

Questions

How many residential new-construction permits were issued in McKinney, TX recently?

107 residential new-construction permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Collin County TX (appraisal district permits).

Which McKinney ZIP codes have the most new-construction permits?

75071 (99 permits), 75069 (5 permits), 75072 (3 permits), by residential new-construction permit count the 8 weeks ending Oct 15, 2026. 3 ZIP codes had at least one permit.

What is the median declared value of a residential new-construction permit in McKinney?

$361,248, across 17 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the McKinney new-construction permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

McKinney new-construction leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing