Home / EV Chargers / Rockville, MD
Public permit data · updated Oct 18, 2026

Residential EV charger permits in Rockville, MD

16 residential EV charger permits issued by Montgomery County MD (electrical), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 15, 2026, 16 residential EV charger permits were issued in Rockville, MD, according to public records from Montgomery County MD (electrical). The busiest ZIP codes were 20850 (7 permits), 20855 (5 permits), 20853 (3 permits). The latest permit date published is Oct 15, 2026.

16
residential EV charger permits, the 8 weeks ending Oct 15, 2026
n/a
median declared value
4
ZIP codes with at least one permit
Oct 15, 2026
latest permit date published
2.0
permits per collected week on average
13
days with at least one permit issued

What an EV charger permit means in Rockville

A residential EV charger permit means a home is adding a Level 2 charger, often with a new circuit or panel upgrade. For an electrician or charger installer it shows which streets are going electric.

In Rockville, permits were issued on 13 different days in the window; the most recent were Oct 14, 2026, Oct 12, 2026, Oct 3, 2026. The busiest ZIPs were 20850 (7), 20855 (5), 20853 (3).

By residential EV charger permit count, Rockville ranks #16 of the 27 EV charger pages on this site and #4 of 8 in MD.

  • Mail neighbors of each charger install while the EV is in the driveway.
  • Offer panel and service upgrades on the streets with the most chargers.
  • Pass the address to solar installers: EV owners are strong solar prospects.

See plans for Rockville EV charger leads

Other work on the same permits

Share of these 16 permits whose type or description also matches another trade. These are the follow-on and partner trades on Rockville jobs.

  • electrical: 16 permits (100%)

Weekly trend

Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 27Sep 3Sep 10Sep 17Sep 24Oct 1Oct 8Oct 15

Top permit types

Permit type / subtypePermitsShare
ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING1381%
ELECTRICAL PERMIT / INSTALL TOWNHOUSE319%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
20850744%0.88
20855531%0.62
20853319%0.38
2085216%0.12

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Level 2 charger1275%
new circuit425%
panel / service upgrade212%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1420852ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGelectrical + EV chargerLevel 2 chargern/a
2026-10-0320850ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGelectrical + EV chargerLevel 2 chargern/a
2026-09-2320850ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGelectrical + EV chargerLevel 2 chargern/a
2026-09-1520855ELECTRICAL PERMIT / INSTALL TOWNHOUSEelectrical + EV chargerpanel / service upgrade; new circuitn/a
2026-09-0320850ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGelectrical + EV chargernot statedn/a
2026-09-0320855ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLINGelectrical + EV chargerLevel 2 charger; new circuitn/a

Source

  • Montgomery County MD (electrical): Permit records on data.montgomerycountymd.gov (dataset qxie-8qnp), published by Montgomery County MD (electrical). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). EV Chargers = the permit's type or work description matches the Curbside Signal EV charger rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Washington-Arlington-Alexandria, DC-VA-MD-WV metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: EV chargers lead to panel and service upgrades, and often to solar and battery storage.

Questions

How many residential EV charger permits were issued in Rockville, MD recently?

16 residential EV charger permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Montgomery County MD (electrical).

Which Rockville ZIP codes have the most EV charger permits?

20850 (7 permits), 20855 (5 permits), 20853 (3 permits), by residential EV charger permit count the 8 weeks ending Oct 15, 2026. 4 ZIP codes had at least one permit.

What is the median declared value of a residential EV charger permit in Rockville?

The source does not publish valuations for these permits.

How do I get the Rockville EV charger permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Rockville EV charger leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing