Home / EV Chargers / New York, NY
Public permit data · updated Oct 18, 2026

Residential EV charger permits in New York, NY

27 residential EV charger permits issued by New York City (DOB NOW Electrical), the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 27 residential EV charger permits were issued in New York, NY, according to public records from New York City (DOB NOW Electrical). The busiest ZIP codes were 11362 (3 permits), 11363 (2 permits), 10471 (2 permits). The latest permit date published is Oct 16, 2026.

27
residential EV charger permits, the 8 weeks ending Oct 16, 2026
n/a
median declared value
21
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
3.4
permits per collected week on average
19
days with at least one permit issued
10
distinct contractors of record (27 permits name one)

What an EV charger permit means in New York

A residential EV charger permit means a home is adding a Level 2 charger, often with a new circuit or panel upgrade. For an electrician or charger installer it shows which streets are going electric.

In New York, permits were issued on 19 different days in the window; the most recent were Oct 15, 2026, Oct 12, 2026, Oct 9, 2026. The busiest ZIPs were 11362 (3), 11363 (2), 10471 (2).

By residential EV charger permit count, New York ranks #11 of the 26 EV charger pages on this site.

  • Mail neighbors of each charger install while the EV is in the driveway.
  • Offer panel and service upgrades on the streets with the most chargers.
  • Pass the address to solar installers: EV owners are strong solar prospects.

See plans for New York EV charger leads

Other work on the same permits

Share of these 27 permits whose type or description also matches another trade. These are the follow-on and partner trades on New York jobs.

  • general remodel: 7 permits (26%)
  • electrical: 5 permits (19%)
  • new construction: 5 permits (19%)
  • HVAC: 2 permits (7%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
New Job Filing / A One Family1141%
Subsequent Filing / A One Family726%
Subsequent Filing / B Two Family622%
Subsequent Filing / C Three Family27%
New Job Filing / B Two Family14%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
11362311%0.38
1136327%0.25
1047127%0.25
1135827%0.25
1135727%0.25

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Level 2 charger2281%
new circuit311%
panel / service upgrade27%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1511355Subsequent Filing / B Two FamilyEV charger + remodelLevel 2 chargern/a
2026-10-0711362Subsequent Filing / A One FamilyEV charger + new constructionLevel 2 chargern/a
2026-09-3011367Subsequent Filing / C Three FamilyEV charger + remodelLevel 2 chargern/a
2026-09-2211229New Job Filing / A One FamilyEV chargerLevel 2 chargern/a
2026-09-1510464New Job Filing / A One FamilyEV chargernot statedn/a
2026-09-0211414Subsequent Filing / A One Familyelectrical + EV chargernew circuitn/a

Source

  • New York City (DOB NOW Electrical): Permit records on data.cityofnewyork.us (dataset dm9a-ab7w), published by New York City (DOB NOW Electrical). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). EV Chargers = the permit's type or work description matches the Curbside Signal EV charger rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the New York-Newark-Jersey City, NY-NJ metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: EV chargers lead to panel and service upgrades, and often to solar and battery storage.

Questions

How many residential EV charger permits were issued in New York, NY recently?

27 residential EV charger permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: New York City (DOB NOW Electrical).

Which New York ZIP codes have the most EV charger permits?

11362 (3 permits), 11363 (2 permits), 10471 (2 permits), by residential EV charger permit count the 8 weeks ending Oct 16, 2026. 21 ZIP codes had at least one permit.

What is the median declared value of a residential EV charger permit in New York?

The source does not publish valuations for these permits.

How do I get the New York EV charger permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

New York EV charger leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing