Home / Electrical / Salem, OR
Public permit data · updated Oct 18, 2026

Residential electrical permits in Salem, OR

23 residential electrical permits issued by Salem OR (structure permits), the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 23 residential electrical permits were issued in Salem, OR, according to public records from Salem OR (structure permits). The busiest ZIP codes were 97306 (7 permits), 97301 (6 permits), 97302 (6 permits). The latest permit date published is Oct 16, 2026.

23
residential electrical permits, the 8 weeks ending Oct 16, 2026
n/a
median declared value
4
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
2.9
permits per collected week on average
14
days with at least one permit issued

What an electrical permit means in Salem

A residential electrical permit covers panel and service upgrades, EV chargers, solar and battery tie-ins, rewires and new circuits. For an electrician it shows where homes are adding load, which usually means more panel and charger work on the same street.

In Salem, permits were issued on 14 different days in the window; the most recent were Oct 16, 2026, Oct 15, 2026, Oct 14, 2026. The busiest ZIPs were 97306 (7), 97301 (6), 97302 (6).

By residential electrical permit count, Salem ranks #84 of the 110 electrical pages on this site and #2 of 2 in OR.

  • Mail EV-charger and panel-upgrade offers around each permit.
  • Partner with the solar and HVAC installers who pull permits in your ZIPs: their jobs often need your work.
  • Watch service-upgrade volume by ZIP to plan crews and stock.

See plans for Salem electrical leads

Other work on the same permits

Share of these 23 permits whose type or description also matches another trade. These are the follow-on and partner trades on Salem jobs.

  • solar: 19 permits (83%)
  • general remodel: 2 permits (9%)
  • plumbing: 2 permits (9%)
  • windows & doors: 2 permits (9%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
Solar Array / Single Family1983%
Alteration / Single Family313%
Addition / Single Family14%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
97306730%0.88
97301626%0.75
97302626%0.75
97305417%0.50

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
solar / battery tie-in1878%
panel / service upgrade1670%
new circuits / outlets1670%
heat pump / HVAC circuit14%
new circuits / outlets (200 A)14%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1697301Solar Array / Single Familysolar + electricalpanel / service upgrade; solar / battery tie-in; new circuits / outletsn/a
2026-10-1597306Solar Array / Single Familysolar + electricalpanel / service upgrade; solar / battery tie-in (200 A)n/a
2026-10-1497306Solar Array / Single Familysolar + electricalpanel / service upgrade; solar / battery tie-in; new circuits / outletsn/a
2026-10-0897302Solar Array / Single Familysolar + electricalpanel / service upgrade; solar / battery tie-in; new circuits / outletsn/a
2026-10-0197306Addition / Single Familyelectrical + addition/ADUnot statedn/a
2026-09-1097305Solar Array / Single Familysolar + electricalpanel / service upgrade; solar / battery tie-in; new circuits / outletsn/a

Source

  • Salem OR (structure permits): Permit records on services.arcgis.com, published by Salem OR (structure permits). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Electrical = the permit's type or work description matches the Curbside Signal electrical rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Salem, OR metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: Remodels and solar installs are the two biggest drivers of residential electrical work. Pro Signals covers both.

Questions

How many residential electrical permits were issued in Salem, OR recently?

23 residential electrical permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: Salem OR (structure permits).

Which Salem ZIP codes have the most electrical permits?

97306 (7 permits), 97301 (6 permits), 97302 (6 permits), by residential electrical permit count the 8 weeks ending Oct 16, 2026. 4 ZIP codes had at least one permit.

What is the median declared value of a residential electrical permit in Salem?

The source does not publish valuations for these permits.

How do I get the Salem electrical permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Salem electrical leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing