Public permit data · updated Oct 18, 2026

Residential concrete and driveway permits in Miami, FL

38 residential concrete and driveway permits issued by City of Miami, the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 38 residential concrete and driveway permits were issued in Miami, FL, according to public records from City of Miami. The busiest ZIP codes were 33127 (6 permits), 33138 (4 permits), 33133 (4 permits). The median declared value was $5,000 across 18 permits that list one. The latest permit date published is Oct 16, 2026.

38
residential concrete and driveway permits, the 8 weeks ending Oct 16, 2026
$5,000
median declared value (18 with value)
13
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
4.8
permits per collected week on average
26
days with at least one permit issued
29
distinct contractors of record (34 permits name one)

What a concrete and driveway permit means in Miami

A residential concrete or driveway permit is a new or replaced driveway, driveway approach, curb cut, sidewalk or slab. For a concrete contractor it marks streets where homeowners are paying for flatwork now.

In Miami, permits were issued on 26 different days in the window; the most recent were Oct 16, 2026, Oct 15, 2026, Oct 14, 2026. The busiest ZIPs were 33127 (6), 33138 (4), 33133 (4).

By residential concrete and driveway permit count, Miami ranks #2 of the 9 concrete and driveway pages on this site and #1 of 3 in FL.

  • Mail the block around each new driveway.
  • Offer sealing or pavers to new driveway addresses.
  • Track which builders pull the most flatwork permits.

See plans for Miami concrete and driveway leads

Other work on the same permits

Share of these 38 permits whose type or description also matches another trade. These are the follow-on and partner trades on Miami jobs.

  • general remodel: 38 permits (100%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
Residential38100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
33127616%0.75
33138411%0.50
33133411%0.50
33135411%0.50
3313738%0.38

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
driveway38100%
approach / curb cut2053%
sidewalk / walkway13%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1633142Residentialremodel + concrete/drivewaydriveway$5,301
2026-10-0933138Residentialremodel + concrete/drivewaydriveway; approach / curb cutn/a
2026-09-2833133Residentialremodel + concrete/drivewaydriveway; approach / curb cutn/a
2026-09-2233137Residentialremodel + concrete/drivewaydriveway; approach / curb cutn/a
2026-09-1033134Residentialremodel + concrete/drivewaydriveway$12,000
2026-09-0133138Residentialremodel + concrete/drivewaydriveway$39,300

Source

  • City of Miami: Permit records on services1.arcgis.com, published by City of Miami. Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Concrete & Driveways = the permit's type or work description matches the Curbside Signal concrete and driveway rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Miami-Fort Lauderdale-West Palm Beach, FL metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: New construction, additions and garages lead to driveways and flatwork; driveways lead to landscaping and fencing.

Questions

How many residential concrete and driveway permits were issued in Miami, FL recently?

38 residential concrete and driveway permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: City of Miami.

Which Miami ZIP codes have the most concrete and driveway permits?

33127 (6 permits), 33138 (4 permits), 33133 (4 permits), by residential concrete and driveway permit count the 8 weeks ending Oct 16, 2026. 13 ZIP codes had at least one permit.

What is the median declared value of a residential concrete and driveway permit in Miami?

$5,000, across 18 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Miami concrete and driveway permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Miami concrete and driveway leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing