Home / ADUs & Additions / Temecula, CA
Public permit data · updated Oct 18, 2026

Residential ADU and addition permits in Temecula, CA

10 residential ADU and addition permits issued by Riverside County unincorporated (TLMA), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 15, 2026, 10 residential ADU and addition permits were issued in Temecula, CA, according to public records from Riverside County unincorporated (TLMA). The busiest ZIP codes were 92592 (8 permits), 92590 (1 permits), 92591 (1 permits). The latest permit date published is Oct 15, 2026.

10
residential ADU and addition permits, the 8 weeks ending Oct 15, 2026
n/a
median declared value
3
ZIP codes with at least one permit
Oct 15, 2026
latest permit date published
1.2
permits per collected week on average
8
days with at least one permit issued

What an ADU and addition permit means in Temecula

A residential ADU or addition permit is a new unit or more square footage on an existing home. For an ADU builder or addition contractor it shows where lots are being built out, and the subs those jobs need.

In Temecula, permits were issued on 8 different days in the window; the most recent were Oct 15, 2026, Oct 14, 2026, Sep 15, 2026. The busiest ZIPs were 92592 (8), 92590 (1), 92591 (1).

By residential ADU and addition permit count, Temecula ranks #43 of the 46 ADU and addition pages on this site and #11 of 11 in CA.

  • Mail the neighbors of each ADU.
  • Pitch trades to the builders pulling the most permits.
  • Track declared values by ZIP.

See plans for Temecula ADU and addition leads

Other work on the same permits

Share of these 10 permits whose type or description also matches another trade. These are the follow-on and partner trades on Temecula jobs.

  • electrical: 3 permits (30%)
  • garage: 1 permits (10%)
  • deck/patio: 1 permits (10%)
  • irrigation/landscape: 1 permits (10%)

Weekly trend

Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 27Sep 3Sep 10Sep 17Sep 24Oct 1Oct 8Oct 15

Top permit types

Permit type / subtypePermitsShare
FIRE RESIDENTIAL BUILDING (FPRBP) / FCN15 - HIGH FIRE AREA550%
RESIDENTIAL ADDITION, REHAB (BAR) / ADD1 - ADDITION UNDER 1,000 SQ FT220%
FIRE RESIDENTIAL BUILDING (FPRBP) / FCN06 - RESIDENTIAL BUILDING110%
MANUFACTURED HOME RESIDENTIAL (BMR) / FBR - FACTORY BUILT RESIDENTIAL WITH FOUNDATION110%
MANUFACTURED HOME RESIDENTIAL (BMR) / SPR - SITE PREPARATION RESIDENTIAL110%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
92592880%1.00
92590110%0.25
92591110%0.12

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
ADU880%
room addition220%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1592592MANUFACTURED HOME RESIDENTIAL (BMR) / SPR - SITE PREPARATION RESIDENTIALaddition/ADUADUn/a
2026-10-1592592MANUFACTURED HOME RESIDENTIAL (BMR) / FBR - FACTORY BUILT RESIDENTIAL WITH FOUNDATIONaddition/ADUADUn/a
2026-10-1492592FIRE RESIDENTIAL BUILDING (FPRBP) / FCN15 - HIGH FIRE AREAaddition/ADU + irrigation/landscapeADUn/a
2026-09-1592592RESIDENTIAL ADDITION, REHAB (BAR) / ADD1 - ADDITION UNDER 1,000 SQ FTelectrical + addition/ADU + deck/patioroom additionn/a
2026-09-1492591FIRE RESIDENTIAL BUILDING (FPRBP) / FCN15 - HIGH FIRE AREAaddition/ADUADUn/a
2026-09-1092592FIRE RESIDENTIAL BUILDING (FPRBP) / FCN15 - HIGH FIRE AREAaddition/ADUADUn/a

Source

  • Riverside County unincorporated (TLMA): TLMA Permits (Open Data), published by County of Riverside TLMA. Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). ADUs & Additions = the permit's type or work description matches the Curbside Signal ADU and addition rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Riverside-San Bernardino-Ontario, CA metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: ADUs and additions drive HVAC, electrical, plumbing, solar and landscaping work.

Questions

How many residential ADU and addition permits were issued in Temecula, CA recently?

10 residential ADU and addition permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Riverside County unincorporated (TLMA).

Which Temecula ZIP codes have the most ADU and addition permits?

92592 (8 permits), 92590 (1 permits), 92591 (1 permits), by residential ADU and addition permit count the 8 weeks ending Oct 15, 2026. 3 ZIP codes had at least one permit.

What is the median declared value of a residential ADU and addition permit in Temecula?

The source does not publish valuations for these permits.

How do I get the Temecula ADU and addition permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Temecula ADU and addition leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing